Herunterladen Inhalt Inhalt Diese Seite drucken

Functional Check - Kessel Aqualift S XL Anleitung Für Einbau, Betrieb Und Wartung

Pumpstation
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1
Date / Time
Set the respective flashing figure in date and time and confirm with OK. Following the last entry, the menu
item
Product type
Product type
Select Aqualift Mono or Duo pumping station and confirm with OK, the menu item
System variant
Select the relevant system variant and confirm with OK, the menu item
Power quantity
Select the relevant power quantity and confirm with OK, the menu item
Maintenance interval
Select the required maintenance period or enter accordingly and confirm with OK, the menu item
appears, initialisation is complete.
4.7.2

Functional check

Follow the safety instructions in chapter 3.
Switch off the pumping station (if necessary, disconnect the mains power plug)
If necessary, Open the cover of the system tank (inspection chamber)
Fill the system tank with water until the switching level of the system is exceeded
(at least until the pumps are completely covered with water).
Switch on the pumping station (if necessary, plug in the mains plug).
– If installed, check whether the control unit is initialised
– Pump starts up automatically
– The pump pumps out water until the switching-off level is reached (pump head visible once again)
– Pump switches off automatically
If installed, check the control unit for errors/alarm signals. In case of errors/alarm signals, please follow the
instructions in Chapter 7.
2017/10
is displayed.
Installation
40 / 148
System variant
Performance quantity
appears.
Maintenance date
appears.
is
displayed.
System info
010-993

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis

Fehlerbehebung

loading

Inhaltsverzeichnis