Commissioning | Maintenance
ATTENTION!
>
The lifting unit is now operational.
>
Plug in the plug and carry out a function test: Allow water to flow into the tank. The
lifting unit turns on as soon as the electrical power supply is established and the
water level in the tank is above the switch on level.
>
Check all connections/pipe lines for leaks.
>
In addition, observe the specifications in DIN EN 12056-4.
ATTENTION!
Before carrying out any maintenance work on the unit, all power lines should be
disconnected from the mains, and care should be taken that the unit cannot be
inadvertently switched back on. Check the pressure line for damage.
To avoid danger if the power cable is damaged, it must be replaced by the
manufacturer or its service agent or a similarly qualified person.
Change the active charcoal filter:
At least once a year.
>
>
In case of unpleasant odours.
Where water has discharged through the filter.
>
In case of decreasing pump performance remove possible deposits and other
substances in the tank.
If necessary, clean the inlet screen of the pump. To do so, loosen the screen by turning
the bayonet lock and remove it. After cleaning, place the screen with o-ring on the
pump and lock it in place by turning it (see Appendix, fig. 5.2).
In addition, observe the specifications in DIN EN 12056-4.