Herunterladen Inhalt Inhalt Diese Seite drucken

Maintenance; Regular Maintenance - Acteon QUAZ Benutzerhandbuch

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 64
Excessive temperature.
Vacuum pump failure.
Faulty sterilisation.
Faulty decompression.
Faulty ventilation.
Power failure.
Interrupted cycle.
Temperature system failure.
Pressure system failure.
Lack of leak tightness.
Power supply failure.
Door malfunction.

6. MAINTENANCE

QUAZ

Regular maintenance

Preventive maintenance
IMPORTANT: In case any pieces need replacing, only use original parts.
6.1. REGULAR MAINTENANCE
IMPORTANT: Before performing any kind of maintenance, check that: The autoclave is
disconnected from the power supply, that is it not hot and that there is no pressure
inside the sterilisation vessel.
DESCRIPTION
user
Authorised Technical Support
ACTION

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis