Herunterladen Inhalt Inhalt Diese Seite drucken

Preventive Maintenance; Troubleshooting - Acteon QUAZ Benutzerhandbuch

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 64
REGULAR MAINTENANCE SCHEDULE
1.-
WEEKLY
2.-
3.-
4.-
500 CYCLES
5.-
1,000 CYCLES
6.-
1.- Clean: the silicone gasket, door disk and the chamber/silicone gasket contact area.
2.- General cleaning of the external surfaces.
3.- Cleaning of the sterilisation chamber.
4.- Cleaning of the trays and support.
IMPORTANT: Do not use disinfectant products to clean the chamber.
5.- Replacement of the bacteriological filter.
REMOVING THE FILTER
PLACING THE FILTER
6.- Replacement of the silicone gasket on the door.
IMPORTANT: the silicone gasket or the metal surfaces around it could be hot; make sure
before starting that the autoclave is at room temperature.

7. TROUBLESHOOTING

Some possible faults that are not included in the warnings described in section 5 are the following:
PROBLEM
CAUSE

6.2. PREVENTIVE MAINTENANCE

QUAZ
SOLUTIONS

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis