[C000384] Do not use the garage door to lift any
objects or people.
[C000385] Do not use the door when inoperable.
[C000386] Follow the Operating and Mainte-
nance manual to inspect and maintain the door.
Before commissioning the door and during its use
relubricate the rollers, hinges, guards, springs and
bearings.
[C000387] Close the wicket door and lock it with
the key before operating the garage door.
[C000388] Remove the protective film from the
door sheet metal skin immediately after installation.
[C000389] Do not remove or modify any compo-
nent of the garage door.
[C000390] Keep your hands and all objects clear
from the working range of all moving components of
the door and the door latch, lock and guides.
[C000391] Remove the protective film from the
glazing immediately after installation.
[C000392] Removing the panels from the packag-
ing. Do not discard the panel fixing screws, you can
reuse them to install the hinges.
[C000393] Protect the garage door in the packag-
ing against weather.
[A000005] 4. ASSEMBLY RECOMMENDATIONS
Prior to assemble and operate the door, the guidelines contained in this instruction
should be read carefully. All assembling and operating instructions must be strictly
observed. It ensures the correct assembly, and durable and failure-free operation.
All works related to door assembly must be carried out in described order.
[A000006] 5. REQUIRED ASSEMBLY CONDITIONS
The door should be used and operated in compliance with its intended use.
Technical description
IIiO/BS/Comforta/03/2015/ID-95291
Assembly and Operating Instructions – Comforta sectional garage door
Selection and application of doors in construction industry should be based on
technical documentation of the facility developed in compliance with regula-
tions and standards in force.
[B000005] The doors can be mounted to reinforced concrete walls, those
made of bricks, or steel frameworks. A room intended to mount the doors should
be finished completely (plastered walls, finished floor), walls must not have any
faults in quality of work. The room should be dry and free of chemicals being
harmful for coating paints.
Both side walls, and frontal wall and door assembly opening lintel must be verti-
cal and perpendicular to the floor, and must be finished.
It is prohibited to install the door in a room in which fin-
ishing works are still to be done (plastering, gypsum fin-
ishing, grinding, painting, etc.).
Floor in bottom sealing area must be levelled and constructed in such a way
as to ensure free water drain. Appropriate ventilation (drying) of garage must
be ensured.
Installing of electrical drive unit to the door by profes-
sional installer or competent person is to be done ac-
cording to the Assembly and Operating Instruction of
the drive unit.
[B000092] The area to install the door should be free from any pipes, cables, etc.
[C000184] It is prohibited to open the door leaf if the
guides are not mounted.
[D000381] 6. ASSEMBLY PROCEDURE
Activities which must be performed by Professional Installer or Competent person.
Please keep the list of garage door's component parts (specification).
Prior to installation works, check the dimensions (width and height) of the assembly
opening. Carefully perform further installation steps as shown on the figures.
The maximum torque for tightening sheet metal screws to the panel is 7÷9 [Nm].
When this torque is exceeded, the connection can be broken.

Installation procedure:

Fig. 20.1a.
Mark out the holes on the lintel - in the centre of the assembly
opening - to install the spring break device.
Fig. 20.1b.
Drill the holes and insert wall plugs.
Fig. 25.2a. Unscrew the suspension bracket bolts, and screw it back with the
nuts on the outside of the horizontal guides.
Fig. 25.a.
When the guides are installed, check the diagonals as shown
on the figure. The difference of the diagonals should be max
± 3 [mm].
Fig. 30.
Exploded view of the winch shaft with one or two springs. It is criti-
cal to observe the colour marking of drums and springs during its
assembly on the shaft.
Fig. 35.2c.
The safety device should be fastened to the lintel with 4 screws.
Fig. 40a.
The sequence of hinge installation. The hinges should be installed
on both sides of the panel observing the required sequence.
Fig. 40.1b.
Screws should be fastened after door adjustment.
Fig. 55.
When installing panels, the clearance of 1 to 2 [mm] between
the panels should be observed. In order to ensure a proper gap
between panels, approx. 2 [mm] thick cardboard pieces should
be inserted between panels near each hinge.
Fig. 60.3a. Top roller bracket should be mounted to ensure that the roller con-
tacts the lower part of the guide.
Fig. 60.3b. Screws should be fastened after door adjustment.
Fig. 75.1.
When winding up the cable on a drum, ensure that minimum two
cable revolutions remain on a drum, when the door is in its ultimate
closed position.
Fig. 75.2.
Tighten the springs according to the SPRING TIGHTENING RULES.
Fig. 80.
Before operating the door, lubricate all hinges, rollers and springs
with, e.g. semi-solid HWS-100 Wurth grease.
Fig. 80.1.
Unblock the spring break device.
Fig. 80.2.
After mounting, cut the protruding parts of the brackets, blunt its
edges and protect the edges with paint.
Fig. 85.
Cardboard pieces should be removed during door opening,
when the panels are bent towards each other.
Fig. 105.
On the lock side, screw the rod slightly to ensure its free move-
ment. On the bolt side, provide fast joining.
Fig. 105.3c, 105.3d. Place the lock plate to the frame at the level where the lock
is mounted to the panel, and mark out the holes. Make the holes
using 8.5 [mm] drill.
Fig.115.
When mounting a drive unit, block the door bolts in its open
position.