Herunterladen Inhalt Inhalt Diese Seite drucken

Disposal (Lead Time And Hydrostatic Pressure) - Kessel NS 4 Anleitung Für Einbau, Bedienung Und Wartung

Fettabscheider zur selbstentsorgung
Vorschau ausblenden Andere Handbücher für NS 4:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Operating mode
4.4

Disposal (lead time and hydrostatic pressure)

The discharging of the grease separator is possible after heating up the heating cover (see 4.2).
To exploit the hydrostatic pressure as efficiently as possible (the wastewater presses the quantities to be re-
moved out of the grease separator), we recommend the disposal sequence shown below: 1. grease, 2. floating
scum, 3. sinking sediments. After reaching a discharge volume of 180 litres (3 full collection barrels), the grease
separator must be filled with (waste)water again up to the maximum fill level.
Tip:
Carry out disposal during the everyday operation of the grease separator. As a rule, wastewater then runs
on – there is no need to supply any fresh water. Moreover, heat energy (heating cover) can be saved if the
wastewater is warm.
2.
3.
1.
fig. [19]
1.
3.
60 / 80
V 1.0

Werbung

Kapitel

Inhaltsverzeichnis

Fehlerbehebung

loading

Diese Anleitung auch für:

Ns 2Ns 20Ns 7Ns 25Ns 10Ns 15

Inhaltsverzeichnis