Herunterladen Inhalt Inhalt Diese Seite drucken

Insulation Resistance Test - ITT A 14 Montage- Und Betriebsanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

66
english
A
L
PE
B
english

9. Insulation resistance test

An insulation resistance test must not be performed in an
installation with Biral pumps with the electronics connected,
since this can damage the electronics. If a test is performed,
the pump must be electrically disconnected.
1. Switch off/interrupt supply voltage.
Wait 10 mins. until the voltage has decreased!
2. Remove connections from terminals L, N and PE (
3. Short-circuit terminals L and N with a short wire (A).
4. Test with max. 1500 VAC/DC (B) between terminals
L and PE.
Warning: Testing must on no account be performed
between phases (L) and (N).
Max. permissible discharge current < 20mA.
N
5. Remove test set (B).
6. Remove the short wire (A) between terminals L and N.
7. Connect conductors L, N and PE (
8. Switch on supply voltage.

)
)

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

A 12A 15A 13A 16Aw 15-2A 401 ... Alle anzeigen

Inhaltsverzeichnis