Herunterladen Inhalt Inhalt Diese Seite drucken

Initiation/Operating Control; General; Venting; Operating Control - ITT A 14 Montage- Und Betriebsanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

english
english

6. Initiation/operating control

6.1 General

Flush system thoroughly without pump. See section 4.
Fill and de-aerate the system properly.
Only put the pump into operation when the system is full.
Switch on the distribution voltage.

6.2 Venting

Venting of the pump, particularly of the motor space,
is performed automatically after a brief period of operation.
Running dry briefly (max. 2 mins.) does not harm the motor.
There is a danger of scalding

6.3 Operating control

An LED must always be on in sector A2.
See 5.4.1.

6.4 Deblocking

Not necessary. Motor starts with high torque, see section 8.

7. Maintenance, servicing

Before performing maintenance on the pump,
make sure that the pump is taken out of operation,
disconnect all poles from the power grid, and secure
from switching on again.
Only have trained staff do this work.
Mind the operating instructions.
Only perform this work when the system is at standstill.
Take the pump off power.
Switch off the fuse and put on warning signs.
The media in the system may scald you.
The hot surfaces may scald you.
49

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

A 12A 15A 13A 16Aw 15-2A 401 ... Alle anzeigen

Inhaltsverzeichnis