Herunterladen Diese Seite drucken

Fronius OPT/i TIG 2nd SpeedNet Installationsanleitung Seite 13

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

General
Safety
Danger from incorrect operation and work that is not carried out properly.
This can result in serious personal injury and damage to property.
Danger from electrical current.
This can result in serious personal injury and damage to property.
General
Possible mounting positions
WARNING!
All the work and functions described in this document must only be carried
out by technically trained and qualified personnel.
Read and understand this document in full.
Read and understand all safety rules and user documentation for this equip-
ment and all system components.
WARNING!
Before starting work, switch off all devices and components involved, and
disconnect them from the grid.
Secure all devices and components involved so they cannot be switched back
on.
After opening the device, use a suitable measuring instrument to check that
electrically charged components (such as capacitors) have been discharged.
The OPT/i TIG 2nd SpeedNet is moun-
ted on the rear of the power source:
-
in one of the two SpeedNet positi-
ons
or
-
in the Option 1 / 2 position
13

Werbung

loading