English
5
Transport
A pallet should be used to transport the heat pump to its final
installation location. The basic device can be transported with a
lift truck, a pushcart or similar.
CAUTION!
The hydro tower is to be fixed to the transport pallet with
screws.
EN-4
6
6.1 General
The unit should always be installed indoors on a level, smooth
and horizontal surface. The hydro tower must be installed in
such a way that maintenance work can be carried out from the
operating side without hindrance. This can be ensured by main-
taining a clearance of 1 m at the front. The space required (ap-
prox. 30 cm, see dimension drawing) for replacing the protec-
tive anode must be taken into consideration when determining
the required height of the installation room. It must be installed
in a room protected from frost and with short pipe runs.
Setup and installation must be performed by an authorised
specialist company.
ca. / app. / env. 1m
If the hydro tower is installed on an upper floor, the load-bear-
ing capacity of the ceiling should be checked. On account of
the acoustics, measures for isolating possible vibrations should
also be very carefully planned. Installation on floors above
wooden ceilings is not recommended.
NOTE
i i i i
The heat pump is not intended for use over 2000 metres
above sea level.
6.2 Sound
To prevent solid-borne sound from being transmitted to the
heating system, we recommend connecting the heat pump cir-
cuit to the hydro tower using a flexible hose.
452162.66.25-EN · FD 0402
Installation
HWK 332HC
www.dimplex.de