• push the upper guide (27,
fork carriage (29,
13) so as to insert it by a few centimetres,
• slightly lift the fork carriage to insert the lower guide of the fork (30,
part of the fork carriage (31,
• move the second fork (32,
lock trips on the fork (33,
Load the ballast on the PFB fork carriage
Once the fork carriage has been configured, add the Manitou ballast (type 52584283) (34,
onto the rotating telehandler, on the front part and proceed as follows:
13) of the second fork (28,
13),
14) towards the inside of the fork carriage until the safety
14). Second fork fitted on the fork carriage.
13) on the upper part of the
13) with the lower
15)
29
23
27
29
26
31
30
13
33
32
14
34
15
EN