Herunterladen Diese Seite drucken

Ziegler CLAAS CERIO Betriebs- Und Bedienungsanleitung Seite 43

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

INSTALLATION
INSTALLATION
3.1
Preparing the grain header
Unlock and open the protective hoods.
Figure 12
Remove the straps
Twist the left-hand and right-hand strap (F). Dismantle the stalk distributor (G).
Unscrew the bolts (H) fixing the stalk distributors are secured. (Figure 13)
Figure 13
DANGER!
The grain header may sink down! Serious injury or death.
1. Fasten the grain header to the supports.
2. SWITCH OFF the diesel-powered motor.
3. Remove the key from the ignition lock.
4. Disconnect the power supply on the battery breaker.
5. Maintain sufficient distance from the danger zone.
14

Werbung

loading