Herunterladen Diese Seite drucken

KERN DS Betriebsanleitung Seite 82

Vorschau ausblenden Andere Handbücher für DS:

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

4.4 Monitoring of Test Resources
In the framework of quality assurance the measuring-related properties of the balance
and, if applicable, the testing weight, must be checked regularly. The responsible user
must define a suitable interval as well as type and scope of this test. Information is
available on KERN's home page (www.kern-sohn.com) with regard to the monitoring
of balance test substances and the test weights required for this. In KERN's accredited
DKD calibration laboratory test weights and balances may be calibrated (return to the
national standard) fast and at moderate cost.
5 Basic Safety Precautions
5.1 Pay attention to the instructions in the Operation Manual
Carefully read this operation manual before setup and
commissioning, even if you are already familiar with KERN balances.
5.2 Personnel training
The appliance may only be operated and maintained by trained staff.
6 Transport and storage
6.1 Testing upon acceptance
When receiving the appliance, please check packaging immediately, and the appliance
itself when unpacking for possible visible damage.
6.2 Packaging / return transport
Keep all parts of the original packaging for a possibly required return.
Only use original packaging for returning.
Prior to dispatch disconnect all cables and remove loose/mobile parts.
Reattach possibly supplied transport securing devices.
Secure all parts such as the wind screen, the weighing platform, power
unit etc. against shifting and damage.
14
TDS-BA-def-2210

Werbung

loading