Herunterladen Diese Seite drucken

EFOY ProCube 2060A-3 XF Bedienungsanleitung Seite 57

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Commissioning
The unit requires supply air and generates waste heat, which must be
dissipated to the outside. Please take this into account when choosing the
installation location.
If your ProCube has a built-in router, please take the following steps to prepare the
router for operation. If your ProCube was ordered without a router, you can skip this
subchapter.
If you do not have a 230 V power supply on site, you can alternatively
configure the router after commissioning the ProCube. Once the power
solution is working properly, open the lid of the installation box to access the
router. Then configure the router.
The air openings must not be
blocked. Only install the EFOY
ProCube in a horizontal position.
Make sure that the unit is not tilted
more than permitted.
Maximum inclination: 20°.
It must be possible to open the lid
upwards.
Page 57

Werbung

loading