3 0
8 C O M M I S S I O N I N G /
F U N C T I O N T E S T /
D E C O M M I S S I O N I N G
1.
Connect the pump group to the installation by using the pipes. The installation
to the piping must be carried out without any tension.
2.
Connect the pump.
3.
Carry out a pressure test and check all thread connections.
4.
Installation on a distribution manifold: Mount the insulating back shell of the
pump group (1).
5.
Mount the lower insulation element (3) of the pump group.
6.
Run the cable of the pump and of the heat flow meter in the cable channel
of the insulating back shell (1).
7.
Mount the upper insulation element (4) of the pump group and the thermometer
handles (5) by slightly pushing the insulating back shell (1) backwards. Push the
insulating back shell (1) slightly backward.
8.
Mount the insulating front shell (6).
9.
Installation on a distribution manifold: Mount the insulating shell of the distribution
manifold.