Herunterladen Inhalt Inhalt Diese Seite drucken

Connection To Mains - GF ECOS 160 Bedienungsanleitung

Butt-fusion machine
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

7 Fusion preparation
Danger
Caution
Advice
14
7.3

Connection to mains

Danger of electric shock!
Inspect the electrical cords and devices!
Do not connect damaged cords or devices to the power supply.
1. Connect the hydraulic unit, the heating element and the planer to the power outlet
or power generator.
Check the voltage!
The generator has to be started before connecting the consumer and
must supply a constant output tension! Any sudden changes could
compromise the correct welding result and/or damage the control.
2. Set the correct fusion temperature on the heating element with the temperature
control dial.
Functions of control lights:
Red
and
When the fusion temperature is reached, the red light blinks.
3. Check the temperature of the heater plate surface with a quick-indication
temperature measurement according to the set temperature.
Before beginning with the first fusion, we recommend waiting approx. 10
minutes after the set fusion temperature has been reached, to allow even
heat distribution.
Operating instructions ECOS 160/250/315
green
lights
are
on
during
heating
up.

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Ecos 250Ecos 315

Inhaltsverzeichnis