During installation make sure that the withdrawal valve and the piping are aligned. Do not
install the tank regulator under tension. We recommend the "regulator support for CE tanks",
Part no. 02 510 40.
To install the connections, see CONNECTIONS in the assembly manual.
For installation in a dome, we recommend:
Installation of ventilation set (Part No. 02 063 17).
• Prevents water getting into the pressure regulator.
The installation steps are described using a pressure regulator with US POL
connection as an example (British POL connection and POL connection soft)
1. Apply a drop of oil to the conical sealing surface of the POL connector.
2. Screw the POL connection on to the withdrawal valve of the gas cylinder hand-tight.
3. Tighten the piping on the outlet nozzle while bracing against the flat of the pipe coupling.
4. Tighten the POL connector on the withdrawal valve.

LEAK CHECK

Serious burns to the skin or damage to property.
Do not use an open flame to check for leaks.
Leak check before start-up
Before start-up, check the product connections for leaks!
1. Close all shut-off fittings on the connected devices.
2. Slowly open the withdrawal valve or the gas cylinder valve(s).
3. If there is a safety device (e.g. EFV) between the tank and the connected device(s),
open this during the leak check.
4. Spray all connections with a foam producing substance according to EN 14291
(e.g. leak detector spray, Part no. 02 601 00).
5. Bubbles will form in the foam producing substance if there are any leaks.
If you cannot stop the leaks, you must not use the product.

START-UP

After ASSEMBLY and LEAK CHECK the product has been carried out successfully, it is
immediately ready for operation.
1. All shut-off fittings on the gas devices must be closed.
2. Slowly open the gas withdrawal valve.
3. Observe the assembly and operating instructions of the gas device!
16 / 64
Risk of burning or fire
If more bubbles form, re-tighten the connections (see ASSEMBLY).