Herunterladen Inhalt Inhalt Diese Seite drucken

Leak Check - GOK EN61-DS PS 16 bar Montage- Und Bediensungsanleitung

Niederdruckregler
Vorschau ausblenden Andere Handbücher für EN61-DS PS 16 bar:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1
Installation steps (
1. Attach the hose assembly of the gas equipment to the pressure regulator.
• Brace against the nozzle of the regulator housing with a suitable spanner.
2. Remove the plastic cap from the gas cylinder and the sealing nut from the gas cylinder
valve.
3. Connect the pressure regulator to the gas cylinder.
• Screw the cap nut of the pressure regulator on to the gas cylinder valve.
The gaskets at the inlet connections (if provided) must be replaced when re-assembling!
Make sure that the gaskets sit properly in the mounting and that the screws are tightened.

LEAK CHECK

Serious burns to the skin or damage to property.
Do not use an open flame to check for leaks.
Leak check before start-up
Before start-up, check the product connections for leaks.
1. Close all shut-off fittings on the gas appliance.
2. Slowly open the withdrawal valve or the gas cylinder valve.
3. Spray all connections with a foam producing substance according to EN 14291
(e.g. leak spray, Part no. 02 601 00).
4. Bubbles will form in the foam producing substance if there are any leaks.
If you cannot stop the leaks, you must not use the product.
Observe the applicable national installation regulations for LPG systems.
Optional model with pressure gauge
1. Close all shut-off fittings on the gas equipment.
2. Slowly open the withdrawal valve or the gas cylinder valve.
3. Waiting time: 2 minutes to ensure temperature equalisation.
4. Mark the position of the black pointer on the face of the pressure gauge.
If a red pointer is printed on the face of the pressure gauge, you can mark the
position of the black pointer by turning the face.
5. Testing time: 10 minutes.
The gas pressure displayed on the pressure gauge must not decrease during the entire
testing time. If the pressure decreases, the entire LPG system must be checked for leaks.
6. Spray all connections with a foam producing substance according to EN 14291
(e.g. leak spray, Part no. 02 601 00).
7. Bubbles will form in the foam producing substance if there are any leaks.
If you cannot stop the leaks, you must not use the product.
Artikel-Nr. 01 150 50 f
Observe the installation notes in the CONNECTIONS table)
Risk of burning or fire
If more bubbles form, re-tighten the connections (see ASSEMBLY).
If more bubbles form, re-tighten the connections (see ASSEMBLY).
EN61-DS PS 16 bar
17 / 50

Werbung

Inhaltsverzeichnis

Fehlerbehebung

loading

Inhaltsverzeichnis