8.3
Inspection findings
The device was subjected to a test for operational readiness. No/the following* defects were found:
Scope of inspection: Functional and visual inspection according to specifications
Partial inspection still outstanding:
There are no *) objections to commissioning, subsequent testing is not *) required.
(place, date)
Confirmation of acceptance:
Operator (Company stamp, date, signature)
Defects noted **)
Deficiencies corrected **)
*) Please delete where not applicable
**) Confirmation of the operator or an authorized representative with date and signature
® Copyright ATH-Heinl GmbH & CO.KG, All rights reserved / Misprints and technical changes reserved
52
Visual inspection (authorized expert)
Inspection findings
on a regular/extraordinary inspection/re-inspection*.
Release date: 10-2022 / Product manufacturer ATH-Heinl GmbH & CO. KG
(Signature of expert)
(Name of expert)
(Job title)
(Address)
(Employed by)