Herunterladen Inhalt Inhalt Diese Seite drucken

Spirit XE 295 Benutzerhandbuch Seite 44

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Step 4: Plastic parts
1. Fix the two WHEEL COVERS (79) to the rollers with 4 PHILLIPS HEAD SCREWS (115).
2. Install the LEFT HANDLE BAR COVERS (81 & 82) and RIGHT HANDLE BAR COVERS (83 & 84) to
the Handle Bar axle connections with 4 SHEET METAL SCREWS (119) on each side.
3. Look closely at the four floor levelers underneath the middle and rear of the elliptical. If any of these
aren't in contact with the floor, use the WRENCH to loosen the bottom nut.
Once the nut has been loosened, turn the rubber caster clockwise until solid contact with
the floor is present. Retighten the bottom nut to prevent it from moving.
Needed Hardware for this step:
#119. Ø 3.5 × 12mm
Sheet Metal Screw (8 pcs)
ATTENTION!
Make sure all screws are all firmly tightened after all parts have been installed.
#115. M5 × 12mm
Phillips Head Screw (4 pcs)
44

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

78301

Inhaltsverzeichnis