5. INSTALLATION
All of the operations described in chapter 5 may be carried
out exclusively by specialized technicians, who must organize
all the operational sequences and use suitable equipment, in
strict compliance with the applicable regulations currently in
force.
The machine must be installed indoors in a well-lit and well-ventilated room with
a fi rm, solid, level fl oor (slope less than 2°).
The machine is of the attended type, and must be installed in
places where it can be monitored by trained personnel.
Warning: it is forbidden to install the machine in a place where
it may be reached, touched and/or operated by persons other
than those specifi ed in section 1.2.
The machine may only operate in places with an ambient temperature ranging
between 20°C and 32°C.
5.1. List of accessories provided
• Vaseline: to lubricate all of the parts indicated in this manual after washing
and sanitization operations.

5.2. Installation-Positioning

The installer must check that:
• the site has been duly prepared for machine installation;
• the surface the machine will be installed on is fi rm, fl at and solid;
• the room is adequately lit, ventilated and hygienic and an electric outlet is
within easy reach.
Adequate clearance must be left around the machine to enable
personnel to work without any constraints and also to leave the
work area immediately in case of need.
Figure 9 shows the minimum clearances for installation.
The fi gure indicates the spaces required for accessing:
• the control panel on the right side;
• machine parts so that they may be serviced in the event of a fault.
Fig.11
SL320000819 Ed.12 - 07-2013
Note: clearance of 25 cm (10 inches) must be left at the top.
After positioning the packing container in the vicinity of the installation site, pro-
ceed as follows:
1. cut the straps securing the box;
2. lift the cardboard box;
3. then lift the machine and position it on the prepared site.
Before the machine is used for the first time, its components must
undergo thorough cleaning and the parts that will come into con-
tact with the granita must be sanitized; for further details see the
relevant section herein.

5.3. Disposal of packing materials

After opening the box, make sure to separate the packing materials according
to type and dispose of them in accordance with the current regulations in the
user's country.
We recommend keeping the box for future conveyance or transport.

5.4. Electrical connection

This job may be performed only by specialized technical per-
sonnel.
Before plugging in the machine, make sure that the main switch is on "0".
The Purchaser is responsible for making the electrical connection.
The machine must be connected to the electricity mains by means of the plug
fi tted on the power cord. Be sure to comply with:
• the technical regulations and standards in force at the time of installation;
• the data shown on the rating plate on the side of the machine.
Warning: the electric outlet must be situated in a place easily
within reach of the user, so that no effort is required in order
to disconnect the machine from the power supply when neces-
sary.
If the power cord is damaged, you must have it replaced either by the
manufacturer or a specialized technician.
It is forbidden:
to use extension cords of any type;
to replace the original plug;
to use adaptors.
- 9_EN -

Werbung

Inhaltsverzeichnis
loading

Verwandte Produkte für Gastrodomus GRANISMART 1 BRS

Diese Anleitung auch für:

Granismart 3Granismart 1Granismart 2

Inhaltsverzeichnis