INSTALLATIoN
Appliance shutdown
11.3 Recommissioning
Material losses
!
To ensure that the bare wire heating system is not dam-
aged following an interruption to the water supply, the
appliance must be recommissioned by taking the follow-
ing steps.
f Disconnect the appliance from the power supply by
f
removing the fuses/tripping the MCBs.
f Open the tap for at least one minute until the appli-
f
ance and its upstream cold water inlet line are free
of air.
f Switch on the power supply again.
f
12. Appliance shutdown
f Isolate all poles of the appliance from the power supply.
f
f Drain the appliance (see chapter "Maintenance / Draining the
f
appliance").
84
| DHE
13. Installation alternatives
Overview of installation alternatives
Electrical connection
On unfinished walls, connected from above
On unfinished walls, connected from below, short
power cable
Finished walls
water connection
Finished walls
other
Installation with offset tiles
Rotated appliance cover
Horizontal installation of the appliance
WARNING Electrocution
Before any work on the appliance, disconnect all poles
from the power supply.
IP rating
IP 25
IP 25
IP 24
IP rating
IP 24
IP rating
IP 25
IP 25
IP 24