Herunterladen Inhalt Inhalt Diese Seite drucken

Connector Assignment Of Slot Ii (4-Pin Only E20) Input For Pulse Signal And Metering Lock; Installing The Pulse Control (Water Meter, Only E20) - ECOLAB ELADOS EMP KKS Serie Bedienungsanleitung

Membran-kolben-dosierpumpe
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

7.2.4
Connector assignment of slot II (4-pin only E20)
input for pulse signal and metering lock,
Fig. 7.10
Remove the protective cap
Mount the connector plug according to the connector assignment.
ATTENTION

7.2.4.1 Installing the pulse control (water meter, only E20)

Fig. 7.11
417101338_EMPKKS.doc
1: output 5 V (loadable with max. 50 mA)
2: pulse input
3: metering lock
4: GND ( ┴ )
(plug assignments: see also chapter 12.5.2)
Only use a connector plug from our product range! (included in the delivery scope)
51
Rev: 08-01.10

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis