Herunterladen Inhalt Inhalt Diese Seite drucken

Materials; Connector Assignments; Connector Assignments: Connector I (3-Pin E11 And E20); Connector Assignments: Connector Ii (4-Pin Only E20) - ECOLAB ELADOS EMP KKS Serie Bedienungsanleitung

Membran-kolben-dosierpumpe
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

12.4

Materials

Pump-head:
Metering-piston/-cylinder:
Diaphragms:
Seals:
Valves:
Valve-balls:
O-ring:
Valve-springs:
Housing:
Colour:
Special versions available on request.
12.5

Connector assignments

12.5.1

Connector assignments: Connector I (3-pin E11 and E20)

Fig. 12.5
ATTENTION
12.5.2

Connector assignments: Connector II (4-pin only E20)

Fig. 12.6
12.5.3

Connector assignments: Connector III (4-pin E11 and E20)

Fig. 12.7
ATTENTION
417101338_EMPKKS.doc
PVDF
Ceramic
PTFE-EPDM composite
FPM (Viton B), optionally EPDM
PVDF
Ceramics
FPM, optionally EPDM
Hastelloy C4/C22 PTFE coated
thermoplastic polyester
blue, RAL 5007
Connector for low-level advance warning or empty report
In the event that the empty report is not used, contact 3/4 must always be bridged! The
protective cap provided for this (see chapter 7.2.2) creates the bridge between he
contacts and must be attached in this case.
Connector for pulse signal input and metering lock
Connector for empty report, fault and stroke signal output:
At 115V/230 V, a simultaneous connection of contact 1/2 (alarm output) and 3/4 (stroke
signal output) is generally not permitted.
see also chapter:
see also chapter:
see also chapter:
68
7.2.3
7.2.4
7.2.5
Rev: 08-01.10

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis