9.5

Description of the stroke scale

Fig. 9.5
1
From factory-side the metering pump is set to nominal pressure, in accordance with the
metering curves. If the stroke adjustment was changed by the removal of the position
button, the basic position can be determined as follows:
Switch-on metering pump.
Loosen the 2 opposed grub screws (pos. 2).
Now the stroke adjustment knob (pos. 1) can be removed from the subjacent tooth
system (pos. 4).
Turn the receiving part of the adjustment knob slowly to the left (pos 4)
(counterclockwise), until no medium flows out of the metering connector (pos. 6).
Slide up the adjustment knob (pos. 1) with the marking "0" (pos. 3), congruently on the
marking line of the nonius scale (pos. 5). The adjustment knob has to be slid on the tooth
system until the outer edge has reached the marking "-0" (pos. 5) of the nonius scale.
Tighten again the grub screws (pos. 2).
The stroke setting has now been adjusted according to the special provisions.
NOTE
417101338_EMPKKS.doc
6
To determine the metering capacity the pump ought to be engaged.
Pos.
Description
1
Stroke adjustment knob
2
Grub screws (2 x opposed)
3
Adjustment knob markings pict. 32 = 0 point)
4
Receiver for the adjustment knob (teethed)
5
Nonius scale
6
Metering connector
Fig. 9.6