COSMO High‐efficiency pump CPH 2.0
1.
SCOPE OF DELIVERY
1 off
COSMO high‐efficiency pump CPH 2.0
1 off
Thermal insulation shell for CPH 2.0 (2 parts)
1 off
Installation and operating manual
NOTE
Check the delivery for completeness and signs of damage.
All transport damage must be documented.
Report the damage to your supplier to claim compensation/replacement.
2.
STANDARDS AND GUIDELINES
Installations and facilities for domestic heating and drinking water heating
systems, electrical connections, product standards.
Observe the applicable regulations for accident prevention and environmental
protection, as well as the legal requirements for installation, assembly, and operation.
In addition, the relevant guidelines of DIN, EN, DVGW, VDI, and VDE (incl. lightning
protection) as well as all applicable country‐specific standards, laws, and guidelines
must be observed. Also applicable are old and newly introduced regulations and
standards (but not mentioned here) that are relevant for individual cases.
Moreover, the regulations of your local power utility must be observed.
3.
SAFETY
3.1
Symbols used in the manual
The following symbols are used in this installation and operating manual:
The following warning, instruction, and safety symbols are used in
this installation and operating manual to draw attention to possible
health hazards and material damage, as well providing important
information for installing and operating the product.
29