Herunterladen Inhalt Inhalt Diese Seite drucken

Faults - LR-Cal LSP 1000-H Bedienunganleitung

Hydraulische druckvergleichsprüfpumpen zur erzeugung von kalibrierdrücken bis 1000 bar, bis 1200 bar oder bis 1600 bar
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

8. Faults

Fault
Equipment does not
provide any output
pressure
Equipment provides
pressure but pressure
decays to zero
Equipment provides
pressure but pressure
decays when
locking lever is
operated
Equipment provides
pressure but pressure
decays to lower
value, then remains
steady
DRUCK
&
TEMPERATUR
Leitenberger GmbH • Bahnhofstr. 33 • D-72138 Kirchentellinsfurt • GERMANY
Tel. +49 (0) 7121-90920-0 • Fax +49 (0) 7121-90920-99 •
Druckvergleichsprüfpumpen
Pressure comparison pumps
Cause
No opera�ng liquid in the
spindle
pump
or priming pump
Locking lever open.
Device under test has too
large volume.
Missing or damaged gaskets,
shown by signs of unexplained
liquid leaks.
Locking lever assembly
damaged.
Incorrect opera�ng procedure
being used.
Missing or damaged gaskets,
shown by signs of unexplained
liquid leaks.
Locking lever assembly
damaged.
If unable to locate a cause.
Incorrect opera�ng procedure
being used.
If unable to locate a cause.
Not enouph liquid filled
into the pump.
Air in the system.
If unable to locate a cause.
Internal damage.
DT
-Info@Leitenberger.de •
39
LR-Cal
LR-Cal
Measures
Check, that the test pump is filled with liquid.
Fill the equipment as necessary.
.
See chapter 6.4.
For checking the filling of the priming pump as per
chapter 6.4, open the knurled nut (7) and, if
applicable, fill some liquid into the priming pump
and close knurled nut (7) hand-screwed.
Close locking lever and try again.
Prefill component with liquid before test.
Check gaskets (O-rings) and replace if
necessary.
Check condi�on of locking lever. Replace
or return the unit to
DRUCK & TEMPERATUR Leitenberger GmbH
Ensure that correct opera�ng procedure is
being followed
See chapter 6.4.
Check gaskets (O-rings) and replace if
necessary.
Check condi�on of locking lever. Replace
or return the unit to
DRUCK & TEMPERATUR Leitenberger GmbH
Return the unit to
DRUCK & TEMPERATUR Leitenberger GmbH
Ensure that correct opera�ng procedure is
being followed
See chapter
6.4
.
Return the unit to
DRUCK & TEMPERATUR Leitenberger GmbH
Check liquid level in the reservoir.
Fill up if necessary with liquid
S
ee chapter 3 .
.2
Follow chapter
6.4 and
pressure 5...10 bar.
Return the unit to
DRUCK & TEMPERATUR Leitenberger GmbH
Return the unit to
DRUCK & TEMPERATUR Leitenberger GmbH
www.druck-temperatur.de
LSP-H
MANUAL
LSP-H
generate priming

Werbung

Kapitel

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Lsp 1200-hLsp 1600-h

Inhaltsverzeichnis