Herunterladen Inhalt Inhalt Diese Seite drucken

WIKA LGG serie Betriebsanleitung Seite 22

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

7. Maintenance, repair and cleaning
Following successful repair, recommission the glass level gauge, see
chapter 5.4 "Commissioning".
Replacing the glass tube with model LGG-G
EN
Depressurise the vessel
Close the lower and then the upper valve head
Open the drain valve and allow the media to drain
Remove protective devices, if present
Remove the damaged glass tube and sealings
Insert new sealing rings
For mounting, see chapter 5.3 "Mounting of model LGG-G"
Carry out the leak test
Following successful repair, recommission the glass level gauge, see
chapter 5.4 "Commissioning".
Replacing the valve head
A valve head can only be replaced after the glass level gauge has been
isolated from the process. If necessary, the indicator must be removed
from the vessel.
It is recommended that the repair of valves is carried out by the
manufacturer.
Repair work by the plant operator should only be carried out by trained,
skilled personnel, who have proven experience in such work. Following
the completion of the work, the functional safety of the shut-off devices
must be ensured by the plant operator on their own responsibility.
22
Operating instructions glass level gauge, model LGG

Werbung

Kapitel

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Lgg-rLgg-tLgg-mLgg-g

Inhaltsverzeichnis