Page 20
4.3

Putting into Operation

DANGER
Check the premises before setting up the conveyor system. Flaws can be detected and improved at an early
stage. Observe the following points before setting up the conveyor system:
§
The floors in the premises where the appliance is to be set up must be level and correspond to the
required load-bearing capacity of 196 N/m² (20 kg/m²).
§
We do not recommend dowelling the conveyor system with the floor of the premises because of the
moisture barrier layer existing in the most of cases.
§
There must be a possibility after consultation to connect the conveyor system to the mains.
The user of the conveyor system must take other measures beforehand to ensure the safety of the operating
staff:
§
Specify the field of application and draw up corresponding safety instructions.
§
Instruct the operating staff in safety.
§
Give the operating staff training.
§
Mark hazardous areas.
4.3.1

Connecting the conveyor system

The following points are to be observed when connecting the conveyor system:
§
Have the power supply installed and the conveyor system earthed in a professional manner.
§
Protect power supply cables against exposure to moisture.
§
In case of unintended reactivation, stop the appliance by using the control system.
Technical specifications of the mains in some countries deviate from those given in these operating
instructions. Thus, the connecting data of the conveyor system should be harmonized with the data of the
local power mains. Compare the specification given in the rating plate with the local electrical specifications.
To connect the conveyor system, proceed as follows:
§
Connect the connecting cable with the distributor of the conveyor system.
§
Connect the three-phase motor so that it rotates in a specified direction.
Electrical connections SPV/SGR
Control system and
power distribution
Number of 230 V
sockets
Electrical supply
Cable cross section
Q
The cable cross sections given above are a recommendation of
depending on the length and consumption can vary considerably.
Belt Conveyor System
SGR | SPV
Transport, Assembly, Putting into Operation and Decommissioning
Hazardous electrical voltage
The electrical voltage may be considerably dangerous to limb and life of
persons and lead to injuries.
All work on electrical installations or operating materials should only be
carried out by a certified electrician or by trained personnel under supervision
and monitoring of a certified electrician according to the certain electro-
technical regulations.
Before starting work switch live parts voltage-free. Ask another person to
assist you that can press the Emergency Stop button in case of emergency.
SGR
SPV cold
-
0
230V~, N/PE
230V~, N/PE
3x2,5 mm²
3x2,5 mm²
SPV-I
SPV-II
8
12
400V 3~, N/PE
400V 3~, N/PE
5x6,0 mm²
5x10,0 mm²
®
HUPFER
. Dimensions of cross sections
Putting into Operation
SPV-III
18
400V 3~, N/PE
5x16,0 mm²
4330053_A5