Herunterladen Inhalt Inhalt Diese Seite drucken

Aventics CMS series Betriebsanleitung Seite 59

B-design
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1
AVENTICS | EtherNet/IP™ | R412012728–BDL–001–AC
How to assign the valve supply:
1. Open the lower screw cap B (see fig. 6 on page 58).
2. Using the S4, S5, and S6 switches, assign each valve group to one of the two
supply voltages U
or U
Q1
Below you will find examples for the assignment of the S4, S5, and S6 switches and
for supplying assembled valves in tab. 15 on page 60 (examples 1 to 3) and tab. 16 on
page 61 (examples 4 to 6). The following example combinations are listed there:
1)
Examples
Double subbases used
Example 1
Double subbases for double
solenoid valves
Example 2
Double subbases for double
solenoid valves
Example 3
Double subbases for double
solenoid valves
Example 4
Double subbases for single
solenoid valves
Example 5
Double subbases for double
solenoid valves
Combined with
Double subbases for single
solenoid valves
Example 6
Double subbases for double
solenoid valves
Combined with
Double subbases for single
solenoid valves
1)
These examples only apply if there are no module extensions. You can also arrange other
combinations based on your requirements.
2)
From an electrical connection viewpoint, the double subbases for double solenoid valves must
come first and then those for single solenoid valves.
3)
The maximum number of solenoids for all subbases is 32.
Commissioning and Operation
(see fig. 6 und tab. 14 on page 58).
Q2
2) 3)
59
Valve equipment
Double solenoid valves
Single solenoid valves
Single and double
solenoid valves
Single solenoid valves
Double solenoid valves
Single solenoid valves
Single and double
solenoid valves
Single solenoid valves

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Cms-b-beip

Inhaltsverzeichnis