Herunterladen Inhalt Inhalt Diese Seite drucken

How To Set Up The System And Put It Into Operation; How To Prepare The Control Unit; How To Connect The Interpreter Station; How To Put The System Into Operation - Beyerdynamic SIS Bedienungsanleitung

Dolmetschersystem für simultanübersetzungen simultaneous interpretation system
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Set up
4.

How to set up the System and put it into Operation

In this chapter you will learn how to set up the SIS interpretation system and how to put it into operation.

How to prepare the Control Unit

• Connect the power cable to the power connection
socket (100 - 240 V, 50 - 60 Hz)
• Switch on the control unit with the on/off switch
"Power" LED
4
will illuminate. After approx. 30 seconds the main
screen will appear on the touch panel.

How to connect the Interpreter Station

• Connect the supplied power supply unit to the interpreter station and to
power
.
23
• Connect the DAN In input
18
connection
of the control unit. Use a CAT.5 cable with RJ 45 plug for
8
this. Please do not use UTP cables. Use FTP or S/FTP cables.
• Connect the DAN Out output
DAN In input
of the second interpreter station and so on. In this daisy
18
chain a maximum of 12 interpreter stations can be connected to the
DAN connection
of one SIS control unit.
8

How to put the System into Operation

• Set the volume control
11
of the interpreter station to
minimum. Connect a headset
or connect a microphone
and a headphone
19
or
.
21
and to a power
18
. The green
19
of the first interpreter station to the DAN
of the first interpreter station to the
17
12
and
or
and
20
19
21
19
20
18
19
4
8
13
EarPatron
11
50
18
17
19
20
21

Werbung

Kapitel

Inhaltsverzeichnis
loading

Inhaltsverzeichnis