Herunterladen Inhalt Inhalt Diese Seite drucken

Phase 5 + 6; Phase 7 + 8 - Lincoln Quicklub series Benutzerinformation

Dosierbarer progressiv-verteiler für fett und öl
Vorschau ausblenden Andere Handbücher für Quicklub series:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 3
User Manual
Operating Instructions
Lubricant Distribution within the Metering Device, continuation
Fig. 14
Phase 3 & 4: Metering piston C supplies V1, Control piston C supplies V2
Phase 3
In phase 3, control piston B has reached its final position
on the left side.
Thereby it opens the junction channel to the right end of
control piston C and metering piston C.
Now the lubricant pressure P is at the right end of control
piston C and metering piston C.
Due to the larger diameter, the lubricant pressure P first
moves metering piston C (black arrow) to the left and then
supplies the enclosed lubricant on the left side of metering
piston C to outlet 4 (V1).
Notes:
Page 10 of 26
LINCOLN GmbH • Postfach 1263 • D-69183 Walldorf • Tel +49 (6227) 33-0 • Fax +49 (6227) 33-259
Operation, continuation
Phase 4
When metering piston C reaches its final position on the
left side, lubricant pressure P moves the control piston C
(black arrow) to the left and additionally supplies the en-
closed lubricant on the left side of control piston C to out-
let 4 (V2).
The total output on outlet 4 is the output of metering pis-
ton C and control piston C (V1 + V2).
NOTE
The upper figure shows the transition from
phase 3 to phase 4.
Fig. 12 and fig. 13 (see page 9) show ex-
emplary schematics of the movements of
6001a02
metering and control pistons.
2.2A-20003-B07
6499y05

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis