User Manual
Operating Instructions
Fault: Blockage in the downstream progressive system
Cause:
Bearing, lines or metering device clogged
In the case of the standard metering devices SSV D 6 to
SSV D 22 the outlet boreholes 1 or 2 are closed.
The fault can be identified by:
a)
grease leaking at the pressure relief valve.
b)
the fact that the indicator pins installed on the metering
devices (if any) no longer move.
c)
the fault signal of the signal lamp (if any) or LED display
Fig. 29
Example of a lubrication system
A -
pressure relief valve
B -
main metering device
C -
secondary metering device
SSV 8
D -
secondary metering device
SSV 6
Tab. 1
Troubleshooting (continuation next page)
Page 20 of 26
LINCOLN GmbH • Postfach 1263 • D-69183 Walldorf • Tel +49 (6227) 33-0 • Fax +49 (6227) 33-259
Troubleshooting
1064b95
E -
Pressure plastic tubes
F -
Secondary metering device
SSV 12
G -
High-pressure hose
Correction:
Find out which is the cause of the blockage and rectify it in
accordance with he following example.
Allow pump to run (see "To trigger an additional lubrication
cycle").
Loosen all main line connections (pos. G) one after the
other from the main metering device (B, Fig. 29) leading to
the secondary metering devices. If f. ex. grease or oil
emerges under pressure from outlet 1 of main metering de-
vice (pos. B), the blockage will be found in the lubrication
circuit of the secondary metering device (pos. D).
IMPORTANT
If there is a blockage in the downstream
system, the main lines are under pressure. In
such a case, it is difficult to detach the push-
in type connecting parts of the main line.
6001a02
Relieve the system by removing the closure
plug on the push-in type pressure relief valve
valve or, if any, by removing the filling nipple.
Let the pump run.
Disconnect all lubricant feed lines E from secondary meter-
ing device D one after the other. If f. ex. grease or oil
emerges under pressure from outlet 3 of metering device D,
the blockage will be found in the line of outlet 3 or in the
connected bearing.
Pump the blocked bearing or line through by means of a
manual pump.
NOTE
When checking the individual outlets, keep
each outlet loosened for quite a while be-
cause per each motor revolution there is only
one piston stroke. A complete cycle of all
6001a02
metering devices requires several strokes.
Check pressure relief valve (pos. A). Replace it, if neces-
sary.
2.2A-20003-B07