Herunterladen Inhalt Inhalt Diese Seite drucken
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1
NOUVAG AG
1)
Plug out the mains cable.
2)
Open the fuse compartment with a screwdriver.
3)
Remove the fuseholder.
4)
Remove the grey fuseholder and insert it again, so that the local mains voltage value appears in
the small window.
5)
Insert the grey fuseholder again and close the fuse compartment.
6)
Check mains voltage on the fuse compartment.
7)
Re-connect plug to control unit.

5.2 Device preparation

1)
Insert support for coolant into support holder.
2)
Insert motor plug of electronic motor into motor jack
3)
If necessary, insert motor plug of a second electronic motor into motor jack
4)
Insert footpedal plug into footpedal jack
5)
If necessary, connect printer (not supplied!) to printer interface (at the back!).
6)
Add on contra angle to electronic motor.
7)
Hose set installation (see also illustrations):
When installing the hose set, please follow the arrow markings on the pump
drawer, as they indicate the direction of the coolant flow!
1. Press button (on the side of the control unit) to open the pump.
2. Pull out pump drawer until it stops.
3. Clamp hose set at the drawer and check fit.
4. Press down drawer with clamped hose set until the drawer locks into place.
8)
Insert plunge-cut mandrel at the end of the hose set into the coolant bottle and hang on the bottle
to the support.
9)
Open crimp roll.
10) Open exhaust valve beneath the drip chamber.
11) Connect the control unit to the socket with the mains plug.
Please ensure that operating voltage and mains voltage agree!
No. 31842 14/06
.
.
MD20
.
5

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis