Herunterladen Inhalt Inhalt Diese Seite drucken

Megging - Grundfos SQE Montage- Und Betriebsanleitung

Vorschau ausblenden Andere Handbücher für SQE:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 50
Fault
4.
Frequent starts
and stops.

10.1 Megging

Megging of an installation incorporating
SQ/SQE pumps is not allowed, as the
built-in electronics may be damaged. See
fig. 13.
L
C
C
C
N
PE
Fig. 13
18
Cause
a)
The differential of the pressure
switch between the start and stop
pressures is too small.
b)
The water level electrodes or level
switches in the reservoir have not
been installed correctly.
c)
The non-return valve is leaking or
stuck half-open.
d)
The supply voltage is unstable.
e)
The motor temperature gets too
high.
C
U
U
U
Remedy
Increase the differential. However, the stop
pressure must not exceed the operating
pressure of the pressure tank, and the start
pressure should be high enough to ensure
sufficient water supply.
Adjust the intervals of the electrodes/level
switches to ensure suitable time between
the cutting-in and cutting-out of the pump.
See installation and operating instructions
for the automatic devices used. If the
intervals between stop/start cannot be
changed via the automatics, the pump
capacity may be reduced by throttling the
discharge valve.
Pull out the pump and clean/replace the
non-return valve.
Check the power supply.
Check the water temperature.

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Sq

Inhaltsverzeichnis