Herunterladen Inhalt Inhalt Diese Seite drucken

Cable Glands - Sentiotec home.com4 Montage- Und Gebrauchsanweisung

Saunasteuerung
Vorschau ausblenden Andere Handbücher für home.com4:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1
Installation instructions, only for experts
193
4. Fasten the sauna control unit onto the cross-head screws using attachment
device A as an aid (see Fig. 1).
5. Screw two chipboard screws (3 x 25 mm) into the lower fastening holes B
(see Fig. 1).

4.2. Cable glands

Power, supply and sensor cables should be laid in advance in the cabin wall and
pulled through the respective cable glands of the sauna control unit.
1
4
Low-voltage connection area for basic module: Heater sensor (F1), bench sensor (F2),
1
humidity sensor (FTS2) and safety shut-off (OSG).
Connection area for basic module for 230 V / 400 V: Supply line, heater cable, light and fan.
2
Expansion module:
Connection area for 230 V: Additional output and booster cable.
3
Connection area for low voltage: Speaker cables, remote start, foil sensor and DMX.
4
Fig. 4 Connection areas
193
p. 16/64
193
2
230 V / 400 V
3
230 V / 400 V

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis