Herunterladen Inhalt Inhalt Diese Seite drucken

Maintenance And Cleaning; Cleaning Intervals; Dismantling And Assembly - Condair 505 Betriebsanleitung

Vorschau ausblenden Andere Handbücher für 505:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen



Maintenance and cleaning

.1

Cleaning intervals

.2

Dismantling and assembly

505
20
Regular checks and periodic maintenance are indispensable prerequisites
for hygienic operation:
– Regular checks
Once a week you should carry out a regular check that includes the fol­
lowing steps:
– cleaning of the water reservoir.
– checking all components being in contact with water (i.e. filter, suction
piece, whirl disk, guiding disk, atomizer ring, etc.).
– Periodic maintenance
The maintenance interval depends on the operating conditions. We rec­
ommend the following intervals:
– high ratio of dust and/or hard water:
– medium ratio of dust and/or normal water:
– low ratio of dust and/or demineralized water:
Note: please refer to chapters 6.2 and 6.3 for detailed descriptions of the
dismantling, assembly and cleaning procedures required by particular com­
ponents.
Dismantling
• Disconnect the unit from the mains (pull the plug out of the socket)
• Remove the atomizer unit and the support disk.
• Remove the aerosol discharge hood from the atomizer unit.
• Firmly hold the whirl disk while turning the suction piece anticlockwise
until it comes off.
• Remove the whirl disk and the guiding disk.
• Carefully dismantle the segments of the atomizer ring.
Caution! Cleaning and replacement of defective parts do not require further
dismantling which is inadmissible and may void the warranty.
Assembly
Proceed in the reverse order of the dismantling procedure to reassemble
the unit.
1 week
1 - 2 weeks
2 -  weeks

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis