Herunterladen Inhalt Inhalt Diese Seite drucken

Check Of Direction Of Rotation; Installation; Installation Place - ITT SEKAMATIK 408E Montageanleitung Und Bedienungsanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Red LED "Alarm"
The red LED illuminates in case of to high liquid level in
tank. Together with the red LED, the built-in acoustic
alarm is activated if the switch in the front cover is in posi-
tion "On". Furthermore, the external fault signal device, if
fitted, is activated.
If the red LED illuminates together with the two green
LEDs the pumps are operating, but the liquid level in the
tank is above the alarm level. The alarm is automatically
reset when the liquid level has been lowered below the
alarm level.
If the red LED illuminates without an illumination of the red
LED "Failure" and none or only one green LED illumi-
nates, please contact your VOGEL service.
White LED "Direction of rotation" (only 3-ph models)
The white LED in the front cover of three-phase control-
lers indicates wether the phase sequence of the mains
connection is correct. If the LED is illuminated, the phase
sequence is wrong.
Note: This function does not prevent the motor from start-
ing and rotating in the wrong direction because it does not
measure the phase sequence to the motor.
Therefore, the direction of rotation of three-phase pumps
must always be checked if the cable between pump and
controller has been removed (see 6.3.).

6.3. Check of Direction of Rotation

1 Ph-pumps do not require any check, as
they always run with the correct direction of
rotation.
If the direction of rotation is wrong,
interchange two of the phases of the electric
power supply. Using an original VOGEL-
control box with CEE-plug, this may be done
by a 180° turning of the small round pole-
socket at the plug-end with a screwdriver.

7. Installation

7.1. Installation Place

Please pay attention to the local regulations for con-
structions and authorisations.
Please pay attention to the regulations for lifting
gears.
All underground, concret and mason's work should be
done by an expert.
Choose the installation place by taking into account the
local regulations und the following points:
• Existing supply and disposal installations must be easy
accessable.
• Never install the pump station close to windows and
doors.
• Make sure that the pump statin is protected against lift-
ing.
• Make sure that the inlet pipes have enough natural fall.
16