Now you can start up your machine:
1. Take down the cup warming tray. Take out the water tank and rinse it thoroughly.
2. Fill the water tank with fresh water deficient in lime, place it back into the machine and put back the cup
warming tray.
3. Plug the machine into an electrical outlet.
4. Turn the machine on by placing the metal switch in the upper position. The green control lamp and the
PID display will come on and a pump noise will be heard. The steam/hot water boiler is now filled with
water simultaneously.
5.1

Fill Mode

On the PID-display will be signed "Fill". This is for filling the coffee boiler. To fill the coffee boiler,
position the brew lever upwards for at least 30 seconds at a time. The coffee boiler and the steam /
hotwater boiler are now filled. The sign "Fill" must be expire after filling 30 seconds. If there is still a
pump noise, the filling of the steam/ hot water boiler is still being completed.
1. If the pump stops and the PID display turns off while the boilers are filled, you have to refill fresh water
in the water tank.
2. If there is enough water in the water tank again, the pump starts to operate again.
3. As soon as both boilers are filled with water, the pump will become quiet. Both boilers are now being
heated in succession whereby the coffee boiler has priority.
4. The PID display will show the current temperatures of both boilers alternately (see chapter 3.3).
5. The machine is ready for coffee preparation as soon as the PID display indicates the pre-set nominal
temperature of 93°C (199,4 °F factory setting). The machine is ready for steam/ hot water dispension
as soon as the PID display indicates the pre-set nominal temperature of 129°C (264,2 °F factory
setting) or the boiler pressure gauge indicates a value of about 1.5 bars.
6. Manual boiler venting is not necessary because the PRO 600 contains a professional
anti-vacuum valve, which automatically vents the boiler during the heat-up phase.
7. The machine is now ready for use.
Please consider that the procedure described in the steps above is the same if the steam/ hot water boiler is
deactivated: also in this case the steam/ hot water boiler will be filled and the PID display indicates the
temperature in the steam/ hot water boiler.
Before preparing the first coffee, please clean the machine by extracting about 2-3 water
tank fillings from the brew group and the hot water wand.
The PRO 600 has a fuse to prevent the machine from overfilling.
It is possible that the machine does not heat up when using it for the first time or when
dispensing large amount of water through the hot water valve. In this case, please switch the
machine off and on again.
Portafilter, drip tray and water tank are not suitable for the dish washer.
6

USE OF THE MACHINE

6.1

Preparation of the machine

The switched off machine is to be placed into operation as follows:
1. Fill the water tank, if necessary.
2. Now turn the machine on (the metal switch in the upper position)
3. To use the steam function, set the steamboiler in the PID-display "ON" (more Information in chapter
6.2.2).
4. Please wait until the desired coffee-, i.e. steam temperature, has been reached (value indicated on the
PID-display). The machine is ready for steam/ hot water dispension as soon as the PID display indicates
the pre-set nominal temperature of 129°C (factory setting) or the boiler pressure gauge indicates a value
of about 1.5 bars. In general, the machine will be heated up in about 15 minutes, depending on the
ambient temperature.
5. The machine is now ready for use.
Bedienungsanleitung / Instruction manual Profitec PRO 600 - I
23
ENGLISH

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis