Inhaltsverzeichnis
-
-
-
Included with Delivery
21
-
-
-
-
-
-
-
PID-Temperature Control
23
-
-
Preparation for Installation
23
-
-
-
-
-
Preparation of the Machine
24
-
Manual Adjustment of the Brewing Pressure
25
-
-
Programming the Temperature of both Boilers
25
-
Switching on / off the Steamboiler
26
-
Programming the CLN Group Cleaning Mode
27
-
Programming the ECO Mode
27
-
Turn off PID Display Feature
27
-
-
Dispensing of Hot Water
28
-
-
Cleaning and Maintenance
29
-
-
Brew Group Cleaning and Degreasing
29
-
-
Transport and Warehousing
31
-
-
-
-
-
-
-
11.1 if the Machine will Not be Used for a Long Period of Time, It Is Recommended to
33
-