Herunterladen Inhalt Inhalt Diese Seite drucken

Webasto Air Top Evo 40 Einbauanweisung Seite 56

Luftheizgeräte
Vorschau ausblenden Andere Handbücher für Air Top Evo 40:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Air Top Evo 40 / Air Top Evo 55
Requirement for the basic unit:
A maximum run-on period of 40 seconds is permitted when the combustion
heater is switched off. Only those combustion heaters may be used with heat
exchangers which are not demonstrably damaged by the reduced run-on
time of 40 seconds beyond their usual operating time.
2.3.
Additional documentation to be used
These installation instructions contain all necessary
information and instructions with regard to the installation of
Air Top Evo 40 / Air Top Evo 55 heaters.
In addition, the operating instructions must also be observed.
Technical information
51

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Air top evo 55

Inhaltsverzeichnis