Herunterladen Inhalt Inhalt Diese Seite drucken

REHM INVERTIG.PRO 240 DC Betriebsanleitung Seite 107

Vorschau ausblenden Andere Handbücher für INVERTIG.PRO 240 DC:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Operat tion
 Info
rm people s
standing by o
spa
rks and prote
ect them usin
 Pres
ssurised gas
s bottles also
safe
ety regulation
ns of the re
Ens
sure that ine
ert gas bottle
bott
les without th
heir protectiv
6.4
Fire pr
revention
Hot sla
ag and spark
ks can caus
materia
als, liquids o
or gases. Re
area an
nd ensure a f
fire extinguis
6.5
Ventila
ation
Work p
places must
be set up, w
conditio
ons of use,
in such a w
unhealt
thy materials
s (see TRBS
Ensure
e that the we
elding area
technic
cal ventilation
n systems.
Do not
t weld paint
ted or solve
poisono
ous gases.
6.6
Check
ks before
The pre
erequisites th
hat
 the
unit is set u
up correctly
ope
eration
 all c
connections (
(inert gas, to
h  Chapter
with
r 5, Putting i
 the
appropriate
maintenanc
terval  Cha
mai
ntenance int
 the
safety mech
hanisms and
con
nector hoses
s) are checke
 the
operator a
and other p
prot
tective cloth
ing, and th
byst
tanders are a
at risk.
6.7
Conne
ecting the
Warnin
ng!
 Cha
apter 6.2 El
lectrical risk
able to
o flow thro
ough chain
curren
nt carrying p
parts.
 Cha
apter 6.2 Ele
ectrical risk
to the
e work piec
ce as clos
connec
ctions affix
xed to point
increas
se the risk o
of electrical
of the dange
ers of the ar
ng a shield th
hat is not flam
o present a
potential da
levant profe
ssional auth
es are not a
able to fall. N
ve caps.
n
se fires if the
ey come into
emove all fla
ammable ma
sher is on sta
and-by.
whilst taking
account of p
way that the
e air the us
2131 and B
GR 500 cha
is well vent
ilated either
ent treated
work pieces
e starting
g
nce with 
in accordan
orch connecti
on) have bee
into operati
on
ce has been
n carried ou
apter 8, Main
ntenance
the compon
ents of the u
ed by the op
erator and a
persons invo
olved have
e working a
area has be
e earth c
cable
ks. Make su
ure that the
s of lifting
machinery
s. Make sur
re that the e
se as poss
sible to th
ts further a
part reduce
shocks and
d stray curre
rc rays and
the hot meta
mmable.
anger. Strictly
y observe th
horities and t
the suppliers
Never transp
port inert ga
o contact w
ith flammabl
aterials from
m the weldin
procedures,
materials an
ser breathes
s is free from
pter 2.26).
r by natural
means or b
s as these
may give o
Chapter 5,
Putting int
en made in a
accordance
t in accorda
ance with th
unit (in partic
cular the torc
are functional
l.
put on the
e appropriat
een shielded
d so that n
e welding c
urrent is no
y, crane lin
nes or othe
earth cable i
is connecte
he welding
area. Eart
e the effect
tiveness an
ent.
al
he
s.
as
GB
le
ng
nd
m
by
off
to
he
ch
te
no
ot
er
ed
th
d
4
43

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis