EN
OPERATION YOUR UNIT
Operation button and display area diagram
OPERATION
AREA
TIMER
CLEAN
ON/OFF
Operation the ice-making process
1.Starting up: Plug in the power plug, the symbol
press the ON/OFF button on the control panel, the machine will start to make ice when
the external pipe add water to reach the standard level on the water tank through the
electromagnetic water valve, then the symbol
display window and symbol
in the upper left of the display window, "25C"means the ambient temperature is 25 ℃ ,
several minutes later, the flashing numbers will be displayed in the ambient
temperature display area, the flashing number"10M"means still need 10minutes to
finish this ice making cycle.
2.Every ice making cycle finished, enter deicing process, the symbol
external pipe can add water to the water tank through the electromagnetic valve, and
the arrow on the symbol
the symbol
can not reach the standard level, the symbol
working. After water shortage, the unit needs to be restarted, otherwise it will start up
automatically after 15 minutes.
Note : Each ice making cycle is around 11-20minutes,the ice making time will be
changed according to the ambient temperature and the water temperature change.
Especially the firstice making cycle, the ice making cycle will be longer because of the
high water temperature in the water tank,.But the ice making cycle will not over
30minutes.
3. Adjust the ice thickness; Press the"+" "-"button on the control panel to adjust the ice
thickness; The number in the bottom left of the display window is the setting of the ice
making time, default is "0", press "+" button one time the ice making time will add one
minutes, the ice will be thicker; Press "-" button one time the ice making time will
reduce one minutes, the ice will be thinner. Restart the machine it will go back to
default "0".
Note: The time currently set only changes the next and subsequent ice making cycle.
DISPLAY
rotate; The ambient temperature will be displayed
will flash until the water reach the standard level, then
extinguish, the unit enter the next ice making cycle; When the water
AREA
will flash in the display window,
will change to light on always in
is always bright, the unit stop
14
OPERATION
AREA
+
flash, the