After crane operation

5.2-1

Securing and transporting the load

During travel observe the maximum headroom of bridges, tunnels,
underpasses and power lines, the permissible total weight and the
permissible axle loads of the carrier vehicle.
Secure the load in accordance with the regulations before starting the trip.
Before starting the trip check that the hydraulic pump is switched off.
Before every trip ensure that the outriggers and support cylinders
have been properly retracted and secured.