Additional equipment
By single rope use, put the rope trough the trolley head and but
the pin trough the rope head an the load attachment of the crane
hook.
By two way rope use put also the rope trough the trolley head
and the trough the bottom sheaver and fix it then at the trolley
head by a pin.
When working with the rope winch it has to be ensured that:
• the rope winch is not overloaded with the lifting capacity of
the crane.
• crane components such as hydraulic extendable arms,
mechanical extensions and pulleys etc. are not overloaded
with the lifting capacity of the rope winch.
4.3-5