Fig.: 21. Swing frame unfolding (example)
Unfold the swing frame:
f Remove the fastening screws 1.
Depending on the version of the charging column, the
swing frame is mounted with one or two screws.
f Fold the swing frame 2 forward.
Once the work behind the pivoted frame is complete:
f Make sure when folding the swing frame that lines and
water discharge hoses are not pinched.
f Attach the swing frame with the fastening screws.
f Close the charging column after completion of the
maintenance and repair work.
20
8.1
Maintenance plan
Carry out the following maintenance work at the specified
intervals.
Maintenance interval every 6 months (biannually)
Part /
Maintenance work
component
Visual inspection for defects or damage.
Check functioning of cover lock and
front plate locks. Clean, grease or adjust
Enclosure
locks if necessary.
Check the fastening to the bedplate.
Clean the outside of the enclosure with
damp cloth.
Visual inspection for defects or damage.
Check the operation of the socket cover.
Check the socket drainage (firm seating
Socket Panel
and escape of the hoses).
Clean the outside of the socket panel
with a damp cloth.
Visual inspection for defects or damage.
Switching and
Check the operation of the RCCB with
safety devices
the test button.
Terminal
Check the terminal points according to
points of the
operating conditions, but at least every 6
connecting
months.
lines
Replace filter mats.
Î"8.2.1 Replacing upper filter"
Î"8.2.2 Replacing lower filter"
Ventilation
System
Check the operation of fans. Replace
worn or defective fans.
Î"8.3.1 Replacing the fan"