2.10.2
Assembly of the 4-post lift
2.10.2.1
Setting up the rails
Setting up and aligning the ramps with crossbars
Unpack the lift by removing all packing materials
Place the rails at the designated locations, making sure to position the lighting rails inwards
Position the crossbars on suitable trestles or square timbers
Then position and fasten the rails to the crossbars.
Note
The main rail P1 (with cylinder) must be on the left side in the direction of travel. The guide
rails for the axle-free jack must point inwards.
Place the front and rear crossbars at the ends of the tracks. The tracks and crossbars should be arranged as
shown.
Before installation, make sure that all accessories are installed in the tracks and crossmembers.