Herunterladen Diese Seite drucken

ATH-Heinl Four Lift 64AP Bedienungsanleitung Seite 103

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1
2.11.2
Security checks
General checks
Make sure that all four columns are at the right angle
Make sure the lift is anchored to the ground and all anchoring bolts are tightened
Make sure all bolts, nuts and screws are tight
Checks under load
Perform two to three complete cycles of raising and lowering under load.
Repeat all checks as described under "General checks".
Listen for loud noises during the lifting/lowering process
If the lifting platforms are at different heights, repeat the leveling process
Note
After installation, fill in the attached
This information will be needed in case of a possible service case.
® Copyright ATH-Heinl GmbH & Co. KG / All rights reserved / Misprints and technical changes reserved
Release date: 02.06.2023 / Product manufacturer ATH-Heinl GmbH & Co. KG
"Test
book".
103

Werbung

loading