Herunterladen Diese Seite drucken

ATH-Heinl Four Lift 64AP Bedienungsanleitung Seite 102

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1
2.11
Before commissioning
Warning
Before commissioning, check all fastening screws, electrical, pneumatic and hydraulic lines
and tighten them if necessary.
Caution: Some of these must be checked at regular intervals and tightened if necessary.
2.11.1
Setting the lifting platform
Check the function of all buttons. Make sure that all detents are unlocked when the Lower button is pressed.
Check the horizontal position of the rails using a spirit level in the following two adjustment options:
Synchronized position:
ü Raise the lifting platform to a height of approx. 600 mm.
ü
The horizontal position can be adjusted by screwing the fastening nut for the lifting cables
Detent adjustment:
ü "Park" the lifting platform in the first detent.
ü
The horizontal position can be adjusted by screwing the fastening nut for the detent rod
1
Then raise the lifting platform completely and lower it completely. Check the synchronization. If necessary, this
must be adjusted again.
Note
Readjustment of the hoist ropes after a short period of operation may be necessary due to the
material and is not a warranty claim, but a maintenance task that is the responsibility of the
user.
® Copyright ATH-Heinl GmbH & Co. KG / All rights reserved / Misprints and technical changes reserved
102
2
Release date: 02.06.2023 / Product manufacturer ATH-Heinl GmbH & Co. KG
in or out.
in or out.

Werbung

loading