Herunterladen Inhalt Inhalt Diese Seite drucken

Opening Meter - VOLTCRAFT VC950 Bedienungsanleitung

Digital-multimeter
Vorschau ausblenden Andere Handbücher für VC950:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

c) Opening Meter
The battery and fuse compartment (13) must only be opened after all measuring lines were discon-
nected from the meter.
The casing design only permits access to the
battery and fuse even when the battery and fuse
compartment is opened. The casing no longer has to
be opened and disassembled completely. These
measures improve user safety and operational com-
fort.
Proceed as follows to open it:
- Disconnect all measuring lines from the meter
and switch it off.
- Remove the rubber protection cover from the
device carefully.
- Loosen and remove the rear battery compartment
screw and remove the battery compartment lid.
- The fuses and the battery compartment can be
accessed now.
- Close the casing again in the reverse order and
screw the battery and fuse compartment closed.
- The meter is ready for use once again.
56

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

124705

Inhaltsverzeichnis